|
FAQs: Maintenance
What should be done if a building is completely remodeled after a WAS has been installed?
If a building is completely remodeled, re-linking all WAPMs to their PIMs is recommended to determine if the remodeling has created any RF communication problems.
(back) |
I need to move a previously installed and linked PIM, do I need to re-link?
Any time a PIM or WAPM is moved or reinstalled, it is a good practice to re-link all WAPM's that were linked to the PIM before re-location. Note: this does not
apply to the WPR.
(back) |
Powered by csFAQ - © 2000,2001 CGIScript.net
|